Dove-Elbe Rowing Centre

Ground surveys for the construction of a starting and finishing tower

Application area: On the river Dove-Elbe, near Allermöhe

 

Scope of services:

_Cone penetration test using the casing system in a sheet pile box, water depth ~ 3 m

_Sounding depth up to 15 m below the river bed

_Measures were performed near the embankment on rever Dove-Elbe with transfer of the sounding crawler by means of an 80 t truck-mounted crane